Transparent blade for see through registration and fine line drawing quality.
Mayline parallel bar installation instructions.
Align cable parallel with edge of board stedge stop cable 1b cable 1a 9.
Up and down arrows will open main level menus and toggle through sub tier links.
Try to move the pulley from left to right.
Be sure cable passes between clamp and corner plate.
These products are also called mayline parallel straightedges parallel drafting bars parallel bars and parallel straightedges.
Over time the screws become loose causing the wire to become slack.
Parallel straightedge replacement parts can be found here.
1 16 of 101 results for mayline parallel bar price and other details may vary based on size and color.
Alvin paral liner 1101 48 mobile parallel straightedge 48 inches.
Overview straightedge mobile parallel ruling w e z grip.
Even in today s world of electronics many design professionals are still using parallel straightedges to draw a line that is square drafting triangles or helping with quick sketches before reproducing your ideas electronically.
This parallel bar moves seemlessly across the drawing surface has resulted in little to no smudging and in conjuction with a proper set.
Free shipping by amazon.
Place each pulley between your thumb and index finger.
Mayline parallel straightedge options explained.
Ball bearing rollers built into durable black phenolic plastic base.
Align cable parallel with edge of board as shown in fig.
Drill 3 32 pilot holes at marked locations.
Ball bearing rollers available in metal recommended for vellum bond and delrin for drafting film.
Attach cable ends with terminals to spring.
Turn knob f onto stud.
Left and right arrows move across top level links and expand close menus in sub levels.
Be sure that the cable passes between cable clamp and l h.
The site navigation utilizes arrow enter escape and space bar key commands.
Get it as soon as wed sep 9.
Install cable clamp e onto stud of left corner plate c.
E z grip cap the e z grip cap is a handy 5 16 raised gripping bar that allows for easy maneuverability.
66 and 72 rectangular desk assembly instructions ard7230 ard6630 ard6030.
The drafting bar literally floats across the drawing surface and come with all mounting hardware.
Secure corner plates using four 6 x 1 2 screws d.
Contact a mayline customer service representative.
Examine the pulley mounts.
2 9 out of 5 stars 4.
Parallel with worksurface edge.
Remember to read all the instructions before beginning the installation or you may miss the opportunity to install the metal clips which stop your bar for moving side side or worse you could damage the bar.