Secure to roof using 9 x 1 1 2 truegrip wood screws item 5.
Selkirk chimney roof flashing installation.
Counterflashing will cover the tops of the step flashing.
Apply caulking compound just above the top of the flashing cone on the chimney casing.
Roof support rafter radiation shield roof flashing universal roof guy kit masonry adapter kit adapter plate maintenance and cleaning of chimney replacement parts list chart 1 offset chimney installation chart 2 chimney height above the roof chart 3 connector pipe clearances cathedral support installation record product registration.
As you roof along a chimney alternate shingles and l shaped pieces of step flashing.
The installation of a conventional selkirk flashing onto a metal roof deck.
Maximum roof pitch allowed for kit is dependent on the chimney s outside diameter od as per table 1 roof pitch table on page 4.
Strength safety and performance are at the heart of every product we make.
Press the flashing into the urethane to achieve a positive seal.
Apply silicone sealant prior to securing the rubber boot flashing to the roof.
This assembly is not a support.
Selkirk installation guide this site uses cookies to offer you a better browsing experience.
Place the mesh screen item 7 around the top of the shield by carefully impaling it onto the spacer tabs as shown in figure 9.
Place the roof flashing suitable for the roof pitch over the chimney casing and nail securely to the roof top end near est roof peak under shingles lower end over shingles to provide a watershed.
Chimney must be supported with one of selkirk s main support assemblies.
Figure 1 figure 2 figure 1 strip b angle strip trimmed to width strip a 1 4 wide slot 3 down from peak side of flashing base metal deck strip a aligned with lower face of the metal deck figure 2 mark and trim to match roof profile strip b aligned.
Refer to the chimney installation instructions.
Please click here for product and technical assistance or a handy rep locator.
Slide the storm collar through the applied compound.
The shield must be mounted so that there is a 1 clearance.