Apply the first course with a full width strip of roll roofing so that its lower edge.
Selvage edge roofing installation.
Install a blue tarp on a roof how to add flashing to a chimney.
Place 9 wide strips of roll roofing along the eaves and rakes positioning them to overhang the deck to 3 8.
Not all building materials are designed to be in contact with each.
Film surface appearance may change during this period which will not affect the performance of this product.
Tamko 19 selvedge edge roll roofing is constructed from tamko s organic mat impregnated with hot asphaltic saturant then coated on both sides with weathering grade asphalt and surfaced with mineral granules in a 17 wide path starting at the edge of the sheet towards the center.
Fasten the strips with rows of nails located 1 and 8 from the roof edge and spaced 4 on center in each row.
Unroll the fiberglass mineral surfaced roll and allow it to relax in direct sunlight.
Selvage edge roofing is installed the same way as full width roll roofing except that each course overlaps the previous course 19 inches instead of 4.
Barrier should be covered with the primary roof covering roofing as soon as possible after installation.
No rain epected eae edge of roof rake edge of roof cut first course base sheet in half to create a starter strip set other half aside for possible use elsewhere 18 40 position starter strip along eave extending it 2 beyond the eave and rake edges of roof.
Diy brick rocket stove cooking without electrical power duration.
Fiberglass mineral surfaced roll roofing is installed using mechanical fasteners nailing or hot or cold processes to seal between plies.
For best adhesion performance it is recommended to not overlap up onto the gripspot walking surface.
Begin installation with a smooth roof deck clean and dry temperature 40 f and rising.
For end laps it is recommended to overlap a minimum of 6 and nail 1 in from the edge along the vertical end lap with 6 spacing between nails.
Horizon tal overlaps to be 3 using the at designated selvage edge.
This forms a 19 inch wide selvedge for overlapping purposes.
Install a full width roll in a horizontal manner such that the edges are flush with eaves and rakes.
Cut the roll into manageable lengths typically 12 to 18 feet before installation.
Back nail every 18 457 mm in the selvage edge.