Next comes another layer of building wrap installed like the first layer.
Siding under windows.
Measure from the locking tab of the siding below to the undersill trim to determine the depth of the notch.
At the top tuck metal drip cap flashing under the siding and on top of the second layer of wrap.
Lock a small piece of scrap siding into the lower panel next to the window.
Then bow the strip of siding and place the other end under the trim.
Apply a bead of caulk to the felt and set the window in the caulk.
Mark it 6 4mm below the sill height.
Start with fitting the end under the trim.
Compare 3 more.
One the ends are tucked in slide the strip upward and snap it into the locking edge of the plank below it.
Around the window you will feed the shorter sections at the sides into the channel located at the top.
Find the best siding on yelp.
It may be that rain water flow off the roof is running between the gutter and fascia as evidence by the drips and that water is wind driven back onto the windows as it falls to the ground.
Cutting and installing the siding 1 place the piece of siding to be installed under the window along the bottom edge and hold it where it will be located horizontally along the wall.
Stain on siding under windows during rainfall check to see if there are drips on the underside of the guttering.
Position the siding to be notched below the window.
This will serve as a template for the horizontal cuts.
Add approximately 6 4mm to both sides these marks represent the vertical cuts.
Georgia pacific j channel clay 0 625 in x 150 in vinyl siding trim.
Mark the cuts for siding under the window.
Install the trim just under the drip cap.
Gap on each side for expansion.
For pricing and availability.
Hold the panel under the window and mark the width of the window opening on the panel.