I wouldn t spend my money on metal.
Shingles porch roof transition.
At this point your will have a starter row at the bottom and a row of shingles along each side.
The starter strip and first row of shingles must be applied 25 cm from the bottom of the slope roof or main roof above the slope transition.
Armourfix and armourvalley membranes must be installed and extended 60 90 cm up the main roof underneath the shingles in order to assure a waterproof connection.
How to join a metal carport roof to a shingle roof.
With the low pitch roof line your metal will hardly show.
After bottom roofing panels have been installed set one piece of transition flashing down where the top portion.
Divide that number by the length of the tabs.
A couple of weeks ago we published a two part series showing how a local roofing contractor shingled a roof with architectural shingles.
You ll have a steeper part of your roof turning into a lower slope so there s a steeper pitch up top and a lower pitch on the bottom.
Measure your roof from the bottom to the top of your porch roof plus one row your last shingles will slide under your home s shingles.
Then put a great swing on that front porch.
We re going to do a pitch transition or change.
The wall portion of the flashing should be flush against the exterior wall and the shingle portion of the flashing should be on top of the porch roof shingles.
The starter strip must be securely glued on the armourvalley membrane.
Snap a chalk line between the two transition marks on the shingle roof.
It will be lovely.
This project guide is a combination of those two articles and it covers replacing the existing roof decking installing underlayment and ice dam protection laying the first row laying shingles in the field flashing ridge shingles and vents and more.
Measure 1 1 2 from bottom edge of transition flashing.
Non hemmed of the transition flashing lies flat on the upper roof.
Install bottom roofing panels first.
Just do shingle and get nice looking high defnition shingles so there is charm.
We need to do something where that change happens so the panels can go down and water can come off hit the lower slope and come off the roof.
This gives you the number of rows of shingles you will need.
String the line along the top of the frame until.
Hold the end of a chalk line at one of the outermost top corners of the carport roof frame.